Sludge Notice on Bibb Store Road
- Joanne Boenig
- Nov 9, 2015
- 2 min read

Tom Hanley has a Biosolids Application sign at the edge of his driveway on Bibb Store Rd. It's suppose to be out and displayed for 30 days but the Louisa monitor told us at a meeting that the company has only given 5 days before delivering biosolids. There is a sign on the Rd connecting chalk level to 522. It also had the bio sign plus. truck warning signs like their spreading Monday. We still need setbacks and it's not to under Louisa regulations for 5 days here's the regulations that state that.

least 30 days prior to the land application, the owner of the land, or someone on the owner's behalf post a sign not smaller than 48 inches in width and 36 inches in height, with black letters at least three inches high and a white background, or such other sign of similar size and make up as the county coordinator approves, on or near the site of application, visible to the public from the nearest public access which shall set forth the fact that biosolids will be applied to the land in the area, the name of the applicator, address and telephone number of a contact person for the applicator, and the name and telephone number of the county coordinator and certify the same to the county coordinator. Such signs shall remain posted until the application is complete.

(7) Deliver to the county coordinator at least 30 days prior to the anticipated date of the land application:
a. A copy of all permits, issued by the commonwealth, allowing the land application.
b. A copy of all information required to be submitted to the commonwealth pursuant to 12VAC5-585-630, including the nutrient management plan, if required by the regulations.
(8) Allow the county to take samples of the biosolids before application.
(9) Allow the county to take soil and water samples before and after the land application.
We need to halt this till setbacks are set and after Nov 23 as in their newspaper notice.
Joanne
Comments